纤维喷涂注意事项
喷涂成品保护及注意事项
Protection of spraying finished products and matters needing attention
对喷涂后的保温吸声层,应提供通风、干燥环境,通常在平均温度25℃,相对湿度≤60%时,依据不同厚度干燥固化时间为24~72小时,此后可进行装饰等其他工序。
The heat absorption layer after spraying, should provide a dry and ventilated environment, usually in an average temperature of 25 degrees Celsius, relative humidity is less than 60%, according to the different thickness of drying and curing time for 24~72 hours, then decoration and other processes.
喷涂成品保护
Finished product protection
喷涂前应安装各种管线、风道等设备吊挂件,避免喷涂完工后在基面钻孔、剔凿。
Before spraying, all kinds of equipment such as pipeline and air duct should be installed to avoid drilling and picking on the base surface after spraying.
施工准备
Construction preparation
喷涂成品在干燥固化期间,避免受到机械碰撞及雨水冲刷。
Spray finished products during drying and curing period to avoid mechanical collision and rain erosion.
对于喷涂层局部因受到碰撞而造成破损时,应进行局部修补;对于经常处于容易受到机械碰撞的部位,可贴覆玻璃纤维布或其它防护材料,用以对纤维层表面进行保护。
For local coating caused by the collision damage, should be carried out for local repair; often vulnerable to mechanical impact part, can stick to glass fiber cloth or other protective materials used to protect the surface of the fiber layer.
保持喷涂区域环境清洁,避免灰尘飞扬,污染成品喷涂层表面。
Keep the spraying area clean, avoid dust flying and pollute the surface of finished product spraying layer.
喷涂施工过程中,喷涂操作人员应按照国家劳动保护条例相关规定,佩带防尘口罩,高空操作人员应佩带安全带等防护用具。
In the process of spraying construction, spraying operators should wear dust masks in accordance with the relevant regulations of the state labor protection regulations, and high-altitude operators should wear protective equipment such as safety belts.