喷涂成品保护及注意事项
Protection of spraying finished products and matters needing attention
对喷涂后的保温吸声层,应提供通风、干燥环境,通常在平均温度25℃,相对湿度≤60%时,依据不同厚度干燥固化时间为24~72小时,此后可进行装饰等其他工序。
The heat absorption layer after spraying, should provide a dry and
ventilated environment, usually in an average temperature of 25 degrees
Celsius, relative humidity is less than 60%, according to the different
thickness of drying and curing time for 24~72 hours, then decoration and
other processes.
喷涂成品保护
Finished product protection
喷涂前应安装各种管线、风道等设备吊挂件,避免喷涂完工后在基面钻孔、剔凿。
Before spraying, all kinds of equipment such as pipeline and air
duct should be installed to avoid drilling and picking on the base
surface after spraying.
施工准备
Construction preparation
喷涂成品在干燥固化期间,避免受到机械碰撞及雨水冲刷。
Spray finished products during drying and curing period to avoid mechanical collision and rain erosion.
For local coating caused by the collision damage, should be carried
out for local repair; often vulnerable to mechanical impact part, can
stick to glass fiber cloth or other protective materials used to protect
the surface of the fiber layer.
保持喷涂区域环境清洁,避免灰尘飞扬,污染成品喷涂层表面。
Keep the spraying area clean, avoid dust flying and pollute the surface of finished product spraying layer.